This is the main V-Flyer Forum for general discussion of everything related to flying with Virgin-branded travel companies.
#443422 by McMaddog
13 May 2008, 10:21
To be fair the delays are a minor slowdown in the ramp up of the machine wired A380s. The first airframe to be so treated - MSN026 was four months late to power on. Hopefully enough slack was put in the later schedules to allow it to be caught up. I think the one not delivered this year is the second machine wired airframe.

Who is online

Users browsing this forum: Google [Bot] and 163 guests

Itinerary Calendar