mitchja wrote:I presume it's still on track to open in April 2020? Once that opens, the existing section of what is currently T2 closes for renovation I believe.
"April 2020" is still being quoted for the completion of the current extension works which, as you say, will then result in the rest of the existing terminal closing for refurbishment for 2 years.
I spent a bit of time in T1 arrivals yesterday on a pick-up run. It's not a terminal VS use, but I have to say the arrivals hall in T1 is cramped, dinghy and unfit for purpose. I can't decide whether it's worse than T3 departure's illogical layout. Considering it's the terminal Etihad and Emirates use, it doesn't provide good first impressions. Either way, I look forward to the completion of the TP works which will see T1 close and hopefully something done to the layout of T3.
At the moment, T2 is by far my favourite terminal at MAN even if it currently resembles a building site. It's a shame there were a few design flaws as far as gate spacing is concerned from the offset and this is despite me not liking how they moved the security area upstairs above the check-in desks when they reconfigured it to make airside the retail outlets that used to be landside and turn the old security area into the duty free shop which, like a lot of places nowadays, you have no choice but to walk through.